Remove loop testing from the critical path

Start field verification months earlier — independent of control room readiness. Our mobile commissioning platform deploys in 48 hours, anywhere in the world.

Cut commissioning time by 40%. Deploy in 48 hours.

Our plug-and-play Mobile Control Room and expert teams transform commissioning bottlenecks into competitive advantage. Protocol-agnostic, offshore-ready.

+50,000 loops tested. Zero TRIR. Proven on  projects.

From Korean shipyards to Brazilian offshore fields, FARAMED delivers measurable results. One partner, full stack, zero interface risk.

Why Choose Us

FARAMED delivers fast, reliable commissioning with mobile control rooms and expert teams.

1. Plug-and-Play Testing Infrastructure

A fully equipped, relocatable control hub designed for fast industrial commissioning deployment.

  • Rapid integration with remote I/O systems for early loop and dynamic testing
  • Reduces infrastructure delays by bypassing permanent cabling dependencies
  • Includes UPS, servers, HMI, and network equipment in a single containerized unit
  • Built to meet industrial standards for safety, connectivity, and resilience

2. PROVEN EXPERTISE

Our specialists bring decades of combined experience in control systems, network architecture, and industrial commissioning.

  • Control System & Network Architecture
  • PLC Systems with Redundancy and Safety Features
  • DCS Implementation & Testing
  • Intelligent Protection Relay Testing
  • Modbus and OPC UA Communication
  • Virtualization (VM ware Esxi, KVM)

3. Flexible deployment

for onshore and offshore sites, ensuring fast and efficient commissioning.

  • Adaptable to harsh and constrained industrial environments (FPSO, yards, plants)
  • Reduced setup time regardless of location complexity or terrain
  • Supports both temporary and semi-permanent operations with minimal logistics
  • Pre-configured for plug-and-play use in remote or hard-to-access areas

4. Comprehensive Testing Tools

Comprehensive testing tools to validate hardware, software, and all communication interfaces efficiently.

  • Supports loop, dynamic, pneumatic, and hydrostatic tests
  • Ensures full system integrity before final integration
  • Compatible with major PLCs and control systems
  • Reduces commissioning errors through standardized and automated procedures

Every project is unique. Let’s discuss yours.

Whether you’re planning an FPSO, LNG terminal, or refinery commissioning — our engineering team can assess your timeline and propose a deployment plan.

View Services
View Services

Track record

Measured results. Verified by our engineering team.

Every number below comes from real project data. Pelicase-based Advanced Loop Check on FPSO, LNG, and offshore platforms.

Productivity

150% more loops per day

8-12 loops/day vs. 3-5 traditional. 25-40 min/loop vs. 90-120 min. ROI: 735% Year 1.

60

Simultaneous loops

-75%

Time per loop

Schedule

25 weeks compressed to 6

5,000 I/O points tested in parallel. Zero carry-over work. Payback in 1.5-2.5 months.

4-5 wks

vs. 8-10 traditional

277

Man-days saved

Quality

Punch list killing

Residual defect rate below 5% vs. 15-20% traditional. 100% automated documentation.

<5%

Residual defect rate

0.00

TRIR

They trust us
they trust us
Bring Your Vision to Life

Ready to start your project?

Mail Us

contact@faramedas.com

Call Us

+33 6 52 67 41 29
FAQ

Your Service Related Questions, Answered Here

Technical answers for commissioning professionals. From system compatibility to deployment timelines, find the information you need to evaluate our solution.