Home/Services
Turnkey solutions for FPSO, LNG terminals, refineries, and offshore platforms. Protocol-agnostic. IEC 62382 compliant. Deployed in 48 hours.
150%
Productivity gain
-75%
Time per loop
735%
ROI year 1
0.00
TRIR
Pelicase-based field verification at Junction Box level with wireless link to Mobile Control Room. Start months before DCS readiness.
8-12/day
Loops tested
25-40 min
Per loop vs 90-120
Containerized command center with servers, UPS, HMI, and SCADA. Pre-configured for your I/O list and P&ID. Operational within 48 hours.
48h
Deployment
60
Simultaneous loops
%20%20pager%20service%20webflow.png)
Functional validation under real operating conditions. From rotating equipment to complex process lines. Early detection before first oil.
Pressurization, leak detection, and certification for pipelines, vessels, and process equipment. HSE compliant, rapid mobilization.
Modular mobile skid for hydraulic system cleanliness. Pressure testing, tubing flushing, and actuated valve operation in one integrated unit.